Care and Use information
|
click to return to Filling Station product sheet |
|
Filling Stationδ
Standard and UV Sensitive
versions
This is an Auto-refilling, low volume reservoir for use with various
automated liquid handlers and manual laboratory use. Use this reservoir to
maintain a constant level from a 500-mL resource vessel for extended assay
operations. Automated Use: Define the reservoir dimensions using the respective software utilities for your Liquid handler. To do this refer to the following dimensions. *Tip: the well access locations, Length and width dimensions are the same as a standard 96/384 well microplate respectively. Dimensions:
Specifications: Refill rate, Adjustable.. 1000uL to 10mL / Minute Material: reservoir . Polypropylene Material: Tubing . TygonΤ Material: Bottle.. Polyethylene Peristaltic Pump CSA, CE, UL 12vdc with 115VAC supply Installation: For the best operational performance, the reservoir base must remain as flat and level as possible. The fill tubing ID is always to be the smaller, thus the drain tubing is always to be the Larger ID. The drain tubing can be pumped back to the fill bottle or a separate waste bottle. The small-bore tubing must be coaxed onto the barb. Patience please. The bottle openings are sized for the tubing. The > symbol is for the larger tubing. Minimize the tubing length to reduce the dead volume. Operation: Fill the resource bottle with reagent. Make sure the overflow prote3ction bottle is connected and Insert the tubing. Route the tubing to avoid sharp bends. Be certain that the fill tubing is the smaller tube and that the direction of rotation is appropriate (clockwise is typical but dependent on the tube routing). Plug the power supply into the wall outlet. ( green LED should be on). Select the rotation button desired. The pump should run if it is out of a strong IR light source. (Incandescent lamp). Depress and hold the MAX button on the controller to accelerate priming of the reservoir. Once the surface has been wetted then install the EvaprCapΤ . It is safe to proceed when the reservoir has enough initial capacity for you assay or has stopped at the sensor level.
Reservoir Clean-up Do not autoclave polypropylene LID
121° C / 15 psi. Cycle length of 15 minutes initial duration to condition the reservoir. The cycle period varies according to the type of chemical / material exposure. Proper periods can only be determined with experience. If you encounter any difficulty with this device or require custom modifications feel free to Contact: JeffCahlik@ACME-Automation or US 423 452 0893
|